Filtrera aktuella meddelanden efter land, CPV-sektor, tidsfrist och uppskattat värde.
resultat: 22
Aktuella möjligheter
Officiella uppgifter
Spara denna sökning som en radarVarje vecka · måndag 08.00 (Paris)Kontroller sker med vald frekvens. E-postmeddelanden rapporterar matchande nya meddelanden och väsentliga ändringar som finns i Tenderiva. Leveransen beror på uppdateringar från de officiella källorna och behandlingen av dem.
Gas Networks Ireland (GNI) is establishing a Qualification System for the provision of Engineering, Procurement, Construction (EPC) works and services (Lot 1) and Operation and Maintenance (O&M) services (Lot 2) for the Strategic Gas Emergency Reserve (SGER). Lot 1 is for the engineering, procurement, and construction works and services to complete infrastructure assets including but not limited the jetty, trestle, topside structures, pipelines, above…
Officiell sammanfattning · English
Gas Networks Ireland (GNI) is establishing a Qualification System for the provision of Engineering, Procurement, Construction (EPC) works and services (Lot 1) and Operation and Maintenance (O&M) services (Lot 2) for the Strategic Gas Emergency Reserve (SGER). Lot 1 is for the engineering, procurement, and construction works and services to complete infrastructure assets including but not limited the jetty, trestle, topside structures, pipelines, above…
The objective of this Qualification System is to qualify Applicants for the design, fabrication, welding, non destructive testing, pressure testing, assembly, inspection, painting, quality assurance, commissioning, delivery and provision of documentation for Pressure Reduction Systems (PRS) and line-pressure (LP) across the Gas Networks Ireland transmission network with operating pressures greater than 16 bar. The following is applicable to the scope of…
Officiell sammanfattning · English
The objective of this Qualification System is to qualify Applicants for the design, fabrication, welding, non destructive testing, pressure testing, assembly, inspection, painting, quality assurance, commissioning, delivery and provision of documentation for Pressure Reduction Systems (PRS) and line-pressure (LP) across the Gas Networks Ireland transmission network with operating pressures greater than 16 bar. The following is applicable to the scope of…
Med ditt samtycke hjälper Google oss att förstå hur Tenderiva används och mäta våra annonsers effekt. Du kan välja enbart statistik. Ingen personlig annonsering eller remarketing.