Officiell sammanfattning · English
Vad upphandlas?
This contract concerns the take-over of AIB's website from its current provider, including the migration of the website from the provider's own hosting environment into AIB's Microsoft Azure tenant, the production deployment of the renewed public site on the basis of a working prototype developed by AIB, and the hosting and maintenance of both the public site and the members area for the full duration of the contract, in accordance with the functional and technical requirements set out in PART III (Technical provisions) of these tender documents. The public site has been designed and built by AIB itself, with AI assistance; the contractor's role is to verify, refine and bring this existing codebase into production, not to design or develop a new website.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
This contract concerns the take-over of AIB's website from its current provider, including the migration of the website from the provider's own hosting environment into AIB's Microsoft Azure tenant, the production deployment of the renewed public site on the basis of a working prototype developed by AIB, and the hosting and maintenance of both the public site and the members area for the full duration of the contract, in accordance with the functional and technical requirements set out in PART III (Technical provisions) of these tender documents. The public site has been designed and built by AIB itself, with AI assistance; the contractor's role is to verify, refine and bring this existing codebase into production, not to design or develop a new website.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 701910-2026. Kontrollerad 12 okt. 2026 11:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.