Officiell sammanfattning · English
Vad upphandlas?
The objective of the procurement is to engage a supplier who will be responsible for the services that shall be provided in contract 3901 Fuel installations. engineering design, execution and commissioning of a complete Jet A-1 fuel system from import point to unloading at two helicopter decks on the roof of the J-building at the new Rikshospitalet, including import station, storage tank, pump room, filtration and water separation installations, pipe system and unloading event at both. the helicopter decks.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The objective of the procurement is to engage a supplier who will be responsible for the services that shall be provided in contract 3901 Fuel installations. engineering design, execution and commissioning of a complete Jet A-1 fuel system from import point to unloading at two helicopter decks on the roof of the J-building at the new Rikshospitalet, including import station, storage tank, pump room, filtration and water separation installations, pipe system and unloading event at both. the helicopter decks.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 610352-2026. Kontrollerad 7 sep. 2026 08:06.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.