The Celtic Interconnector is a joint venture between EirGrid/SONI and its French counterpart, Réseau de Transport d’Électricité (RTE) in France, to develop a means of transporting electricity between Ireland and Central Europe and recoupling the SEM with Europe’s Internal Energy Market. The Celtic Interconnector is a 700MW HVDC cable connecting France to Ireland which will enable the cross-border transmission of electricity and is planned to energise on Q4 2026. In respect of above EirGrid/SONI requires a RCC Core Hub. The solution we are seeking to procure is a “close to real time” application called the “Core Hub” that will receive dynamic data that is transformed, validated and displayed to the user in a dashboard.…
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The Celtic Interconnector is a joint venture between EirGrid/SONI and its French counterpart, Réseau de Transport d’Électricité (RTE) in France, to develop a means of transporting electricity between Ireland and Central Europe and recoupling the SEM with Europe’s Internal Energy Market. The Celtic Interconnector is a 700MW HVDC cable connecting France to Ireland which will enable the cross-border transmission of electricity and is planned to energise on Q4 2026. In respect of above EirGrid/SONI requires a RCC Core Hub. The solution we are seeking to procure is a “close to real time” application called the “Core Hub” that will receive dynamic data that is transformed, validated and displayed to the user in a dashboard.…
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 426520-2026. Kontrollerad 23 aug. 2026 05:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.