Officiell sammanfattning · English
Vad upphandlas?
The project will require the provision of a Senior Building Surveyor Led Design Team including a Structural / Civil Engineer, Fire Safety Engineer, Project Supervisor Design Process (PSDP), Disability Access Consultant, and Commercial Energy Auditor. The purpose of this commission is to: • Assess the current condition and performance of the building; • Identify defects, risks and compliance issues; • Develop a coordinated and prioritised remediation strategy; • Improve accessibility, safety and energy performance; • Prepare design and tender documentation to enable delivery of required works. All related fees and charges associated with the construction and Design Team Services should be included in the lump sum tender price for this tender call.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The project will require the provision of a Senior Building Surveyor Led Design Team including a Structural / Civil Engineer, Fire Safety Engineer, Project Supervisor Design Process (PSDP), Disability Access Consultant, and Commercial Energy Auditor. The purpose of this commission is to: • Assess the current condition and performance of the building; • Identify defects, risks and compliance issues; • Develop a coordinated and prioritised remediation strategy; • Improve accessibility, safety and energy performance; • Prepare design and tender documentation to enable delivery of required works. All related fees and charges associated with the construction and Design Team Services should be included in the lump sum tender price for this tender call.
Gratis
Få nästa upphandlingar inom denna bransch
Få ett veckovis mejl med nya meddelanden som matchar dina kriterier. Kontrollera eller justera kriterierna innan du aktiverar din kostnadsfria bevakning.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 307906-2026. Kontrollerad 22 aug. 2026 03:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.