Officiell sammanfattning · English
Vad upphandlas?
Bryn school needs more capacity and the school has a need for renovation. The capacity shall be increased from a 2.5 parallel school to a 3 parallel school. In addition there is a reception class and a special department within autism spectrum with 9 pupils. The current sports building and new construction shall be demolished. A new building is planned (the new building) and a new gymnasium, total approx. 7,000 m2 gross. The three listed buildings, the Main Building and the two villas, shall be renovated, total approx. 3,600 m2. The works also include various new infrastructure in the ground, a new transformer station as well as outdoor work including a noise reduction screen. The current school site is 11,811 m2. The plan area is located in Teisenveien 40 in the Alna district of Oslo muni
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
Bryn school needs more capacity and the school has a need for renovation. The capacity shall be increased from a 2.5 parallel school to a 3 parallel school. In addition there is a reception class and a special department within autism spectrum with 9 pupils. The current sports building and new construction shall be demolished. A new building is planned (the new building) and a new gymnasium, total approx. 7,000 m2 gross. The three listed buildings, the Main Building and the two villas, shall be renovated, total approx. 3,600 m2. The works also include various new infrastructure in the ground, a new transformer station as well as outdoor work including a noise reduction screen. The current school site is 11,811 m2. The plan area is located in Teisenveien 40 in the Alna district of Oslo muni
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
-
Rättelsemeddelande Aktuellt meddelande
· TED 305599-2026
Ändrade avsnitt: 1 Öppna officiellt meddelande ↗
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 305599-2026. Kontrollerad 22 aug. 2026 03:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.