Uradni povzetek · Čeština
Kaj je predmet naročila?
This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.
Informativni strojni prevod. Uradni povzetek ostaja merodajen.
Uradni povzetek · Čeština
This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.
Brezplačno
Prejemajte prihodnje razpise v tej dejavnosti
Vsak teden prejmite e-pošto z novimi obvestili, ki ustrezajo vašim merilom. Pred vklopom brezplačnega opozorila merila preverite ali prilagodite.
Pripravljalni seznam
Pripravi mojo ponudbo
Točke za preverjanje v uradni dokumentaciji. Vodnik ni samodejna analiza dokumentacije.
- Preberite vso dokumentacijo in spremembe
- Preverite pogoje sodelovanja in zahtevane dokumente
- Preverite ali je potreben ogled ali sestanek
- Preglejte merila za oddajo in njihove uteži
- Preverite razpoložljive vire, proračun in časovnico
- Potrdite postopek in rok oddaje
TED · 684005-2026. Preverjeno 5. okt. 2026 11:05.
https://ted.europa.eu/cs/notice/-/detail/684005-2026
Analiziraj to obvestilo z UI
Analize UI so na voljo s paketom Pro ali Team.
Analize obvestil in datotek PDF uporabljajo isto kvoto.
Zgodovina obvestil
Časovnica postopka javnega naročanja
Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.
-
Obvestilo o javnem razpisu
· TED 674260-2026
Oglejte si obvestilo na Tenderivi
Odprite uradno obvestilo ↗ -
Obvestilo o popravku Prikazano obvestilo
· TED 684005-2026
Spremenjeni razdelki: 1 Odprite uradno obvestilo ↗
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.
Vir in zanesljivost
TED · 684005-2026. Preverjeno 5. okt. 2026 11:05.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.