Resumo oficial · English
O que está a ser adquirido?
UCC hereby issues this information in accordance with the requirements of EC directive 2014/24/EU for Establishment of a Multi Supplier Framework of Contractors using the Open Procedure for the following • Lot 1 Contractor Framework for Small Work Projects Type A (Projects of Value up to €300,000) • Lot 2 Contractor Framework for Small Work Projects Type B (Projects of Value €300,000- €1,000,000) Tenderers are permitted to apply for One Lot Only This competition is to establish a multi supplier framework with a maximum of six Tenderers for each Lot (Framework) to whom specific assignments may be awarded in due course based on the terms of a contract (Framework Agreement), on a non-exclusive basis.
Tradução automática indicativa. O resumo oficial continua a ser a referência.
Resumo oficial · English
UCC hereby issues this information in accordance with the requirements of EC directive 2014/24/EU for Establishment of a Multi Supplier Framework of Contractors using the Open Procedure for the following • Lot 1 Contractor Framework for Small Work Projects Type A (Projects of Value up to €300,000) • Lot 2 Contractor Framework for Small Work Projects Type B (Projects of Value €300,000- €1,000,000) Tenderers are permitted to apply for One Lot Only This competition is to establish a multi supplier framework with a maximum of six Tenderers for each Lot (Framework) to whom specific assignments may be awarded in due course based on the terms of a contract (Framework Agreement), on a non-exclusive basis.
Histórico do anúncio
Cronologia do procedimento de contratação pública
Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.
Ainda não foi identificado nenhum outro anúncio relacionado.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.
Fonte e fiabilidade
TED · 628714-2026. Verificado em 11 de set de 2026 10:05.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.