Resumo oficial · English
O que está a ser adquirido?
The construction of a 2 storey primary care centre of circa 1,615 sqm, Access off the N17 together with associated footpaths, margins and pedestrian crossing; External works comprising the construction of circa 54 car parking spaces including e-Car charging bays, an ESB substation building, together with associated site development works, connections local authority services, works to site boundaries, and signage
Tradução automática indicativa. O resumo oficial continua a ser a referência.
Resumo oficial · English
The construction of a 2 storey primary care centre of circa 1,615 sqm, Access off the N17 together with associated footpaths, margins and pedestrian crossing; External works comprising the construction of circa 54 car parking spaces including e-Car charging bays, an ESB substation building, together with associated site development works, connections local authority services, works to site boundaries, and signage
Histórico do anúncio
Cronologia do procedimento de contratação pública
Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.
Ainda não foi identificado nenhum outro anúncio relacionado.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.
Fonte e fiabilidade
TED · 604063-2026. Verificado em 4 de set de 2026 10:05.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.