Oficjalne podsumowanie · Français
Co jest przedmiotem zamówienia?
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed.…
Pomocnicze tłumaczenie maszynowe. Oficjalne podsumowanie pozostaje rozstrzygające.
Oficjalne podsumowanie · Français
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed.…
Historia ogłoszeń
Oś czasu postępowania o udzielenie zamówienia
Śledź główne etapy i aktualizacje powiązane z tym postępowaniem o udzielenie zamówienia.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.
Źródło i wiarygodność
TED · 753993-2026. Sprawdzono 30 paź 2026, 11:05.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.