Oficjalne podsumowanie · English
Co jest przedmiotem zamówienia?
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Pomocnicze tłumaczenie maszynowe. Oficjalne podsumowanie pozostaje rozstrzygające.
Oficjalne podsumowanie · English
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Historia ogłoszeń
Oś czasu postępowania o udzielenie zamówienia
Śledź główne etapy i aktualizacje powiązane z tym postępowaniem o udzielenie zamówienia.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.
Źródło i wiarygodność
TED · 593644-2026. Sprawdzono 31 sie 2026, 10:05.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.