Oficjalne podsumowanie · English
Co jest przedmiotem zamówienia?
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-risers.2442 Laminate and steel plate doors consist of the following main services: Laminate doorsLaminat doors with beam door with glass panes/sealed beams above/next to the door Doors are with and without windows.
Pomocnicze tłumaczenie maszynowe. Oficjalne podsumowanie pozostaje rozstrzygające.
Oficjalne podsumowanie · English
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-risers.2442 Laminate and steel plate doors consist of the following main services: Laminate doorsLaminat doors with beam door with glass panes/sealed beams above/next to the door Doors are with and without windows.
Historia ogłoszeń
Oś czasu postępowania o udzielenie zamówienia
Śledź główne etapy i aktualizacje powiązane z tym postępowaniem o udzielenie zamówienia.
Nie znaleziono jeszcze żadnego innego powiązanego ogłoszenia.
-
Ogłoszenie o procedurze konkurencyjnej Bieżące ogłoszenie
· TED 451346-2026
Otwórz oficjalne ogłoszenie ↗
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.
Źródło i wiarygodność
TED · 451346-2026. Sprawdzono 23 sie 2026, 10:05.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.