Sommarju uffiċjali · English
X’qed jiġi akkwistat?
The project consists of pyrite remediation works and other specified works to the building and its surrounding area. To provide continuity of the Sphere 17 Regional Youth Service for the duration of the existing building works, temporary decant accommodation on the nearby “Belcamp E” site will be required. This needs to be constructed and in operation before the existing building works can commence. The temporary decant accommodation is to be removed upon the completion of the existing building works and the reoccupation of the building. An Architect-led multi-disciplinary design team is required for this project.…
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
The project consists of pyrite remediation works and other specified works to the building and its surrounding area. To provide continuity of the Sphere 17 Regional Youth Service for the duration of the existing building works, temporary decant accommodation on the nearby “Belcamp E” site will be required. This needs to be constructed and in operation before the existing building works can commence. The temporary decant accommodation is to be removed upon the completion of the existing building works and the reoccupation of the building. An Architect-led multi-disciplinary design team is required for this project.…
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 706143-2026. Iċċekkjat fil-13 Ott 2026 11:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.