Sommarju uffiċjali · English
X’qed jiġi akkwistat?
As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority.
Ħieles
Irċievi s-sejħiet li jmiss f’dan is-settur
Irċievi email kull ġimgħa b’avviżi ġodda li jaqblu mal-kriterji tiegħek. Iċċekkja jew aġġusta l-kriterji qabel tattiva t-twissija bla ħlas.
Lista ta’ tħejjija
Ipprepara l-offerta tiegħi
Verifiki li jsiru fid-dokumenti uffiċjali. Din il-gwida mhijiex analiżi awtomatika tad-dokumenti.
- Aqra d-dokumenti kollha u l-emendi
- Iċċekkja l-kundizzjonijiet ta’ parteċipazzjoni u d-dokumenti mitluba
- Iċċekkja jekk hijiex meħtieġa żjara jew laqgħa
- Eżamina l-kriterji tal-għoti u l-piż tagħhom
- Iċċekkja r-riżorsi, il-baġit u l-iskeda disponibbli
- Ikkonferma l-proċedura u l-iskadenza tas-sottomissjoni
TED · 674521-2026. Iċċekkjat fil-01 Ott 2026 11:05.
https://ted.europa.eu/en/notice/-/detail/674521-2026
Analizza dan l-avviż bl-AI
Ifhem l-essenzjal: sommarju, skadenzi u punti x’tiċċekkja, abbażi tal-informazzjoni disponibbli.
L-analiżijiet tal-avviżi u tal-PDF jużaw l-istess kwota.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 674521-2026. Iċċekkjat fil-01 Ott 2026 11:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.