Miftuħ TED · Sors · Lingwa: English

l-Eks-Repubblika Jugoslava tal-Maċedonia · Xogħlijiet ta’ kostruzzjoni

Titlu uffiċjali · English

Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII

Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI) · l-Eks-Repubblika Jugoslava tal-Maċedonia

Ara avviżi taħt dan l-isem
Sommarju uffiċjali · English

The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total…

X’qed jiġi akkwistat?
Skadenza 20 Jan 2027 12:00 UTC+01:00
Valur stmatMhux imħabbar
Ippubblikat24 Set 2026
Ara l-avviż Analizza dan l-avviż bl-AI Sommarju, rekwiżiti u skadenzi bbażati fuq l-informazzjoni ta’ dan l-avviż. Id-dokumenti tas-sejħa għall-offerti ma jinqrawx.
Iftaħ l-avviż uffiċjali ↗

Sommarju uffiċjali · English

X’qed jiġi akkwistat?

The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total length of approximately 5 km, permanent way, earthworks, drainage, retaining structures, access roads and associated civil and interface works. The cross-border tunnel and its functional area are excluded from this Contract.

Lista ta’ tħejjija

Ipprepara l-offerta tiegħi

Verifiki li jsiru fid-dokumenti uffiċjali. Din il-gwida mhijiex analiżi awtomatika tad-dokumenti.

  1. Aqra d-dokumenti kollha u l-emendi
  2. Iċċekkja l-kundizzjonijiet ta’ parteċipazzjoni u d-dokumenti mitluba
  3. Iċċekkja jekk hijiex meħtieġa żjara jew laqgħa
  4. Eżamina l-kriterji tal-għoti u l-piż tagħhom
  5. Iċċekkja r-riżorsi, il-baġit u l-iskeda disponibbli
  6. Ikkonferma l-proċedura u l-iskadenza tas-sottomissjoni

TED · 659550-2026. Iċċekkjat fil-24 Set 2026 06:05.
https://ted.europa.eu/en/notice/-/detail/659550-2026

Idħol →
Analizza dokumenti tas-sejħa għall-offerti f’PDF

L-analiżijiet tal-avviżi u tal-PDF jużaw l-istess kwota.

Storja tal-avviżi

Kronoloġija tal-akkwist

Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.

S’issa ma ġie identifikat l-ebda avviż ieħor relatat.

  1. Avviż ta’ kompetizzjoni Avviż attwali

    · TED 659550-2026

    Iftaħ l-avviż uffiċjali ↗

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Sors u affidabbiltà

TED · 659550-2026. Iċċekkjat fil-24 Set 2026 06:05.

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Irrapporta żball bl-email