Sommarju uffiċjali · English
X’qed jiġi akkwistat?
Multi-Party Framework Agreement for Architect-Led Integrated Design Team and Project Management Services. The framework will support the delivery of Teagasc's capital development programme and will be used for construction projects with an estimated construction value in excess of €1,000,000. The framework will be established as two separate geographic Lots: • Lot 1 – Northern Region • Lot 2 – Southern Region The successful framework members will be required to provide an Architect-led Integrated Design Team incorporating, as a minimum, the following disciplines: • Architectural Services • Quantity Surveying Services • Civil and Structural Engineering Services • Mechanical and Electrical Engineering Services • Fire Safety Consultancy • Project Supervisor for the Design Process (PSDP)
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
Multi-Party Framework Agreement for Architect-Led Integrated Design Team and Project Management Services. The framework will support the delivery of Teagasc's capital development programme and will be used for construction projects with an estimated construction value in excess of €1,000,000. The framework will be established as two separate geographic Lots: • Lot 1 – Northern Region • Lot 2 – Southern Region The successful framework members will be required to provide an Architect-led Integrated Design Team incorporating, as a minimum, the following disciplines: • Architectural Services • Quantity Surveying Services • Civil and Structural Engineering Services • Mechanical and Electrical Engineering Services • Fire Safety Consultancy • Project Supervisor for the Design Process (PSDP)
Lista ta’ tħejjija
Ipprepara l-offerta tiegħi
Verifiki li jsiru fid-dokumenti uffiċjali. Din il-gwida mhijiex analiżi awtomatika tad-dokumenti.
- Aqra d-dokumenti kollha u l-emendi
- Iċċekkja l-kundizzjonijiet ta’ parteċipazzjoni u d-dokumenti mitluba
- Iċċekkja jekk hijiex meħtieġa żjara jew laqgħa
- Eżamina l-kriterji tal-għoti u l-piż tagħhom
- Iċċekkja r-riżorsi, il-baġit u l-iskeda disponibbli
- Ikkonferma l-proċedura u l-iskadenza tas-sottomissjoni
TED · 612149-2026. Iċċekkjat fil-07 Set 2026 09:06.
https://ted.europa.eu/en/notice/-/detail/612149-2026
Analizza dan l-avviż bl-AI
Sommarju, rekwiżiti u skadenzi bbażati fuq l-informazzjoni ta’ dan l-avviż. Id-dokumenti tas-sejħa għall-offerti ma jinqrawx.
Idħol biex tanalizzaL-analiżijiet tal-avviżi u tal-PDF jużaw l-istess kwota.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 612149-2026. Iċċekkjat fil-07 Set 2026 09:06.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.