Sommarju uffiċjali · English
X’qed jiġi akkwistat?
Replacment of existing reinforced concrete bridge. Works shall include removal of existing structure, installation of foundation, abutmentys per-cast contrete bridge beams and RC concete deck. construction of mansonry parapet walls. rising and resurfacing of the publice to tie in with new bridge deck.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
Replacment of existing reinforced concrete bridge. Works shall include removal of existing structure, installation of foundation, abutmentys per-cast contrete bridge beams and RC concete deck. construction of mansonry parapet walls. rising and resurfacing of the publice to tie in with new bridge deck.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 500779-2026. Iċċekkjat fil-23 Aww 2026 19:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.