Sommarju uffiċjali · English
X’qed jiġi akkwistat?
Micro tunnelling, controlled drilling and pilot pipe drilling connected to a new flood path with an surface water culvert and municipal waste water pipelines at Sundland, in order to ensure handling of surface water to Drammenselva. Bane NOR and Drammen municipalities have shared builder responsibility.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
Micro tunnelling, controlled drilling and pilot pipe drilling connected to a new flood path with an surface water culvert and municipal waste water pipelines at Sundland, in order to ensure handling of surface water to Drammenselva. Bane NOR and Drammen municipalities have shared builder responsibility.
Ħieles
Irċievi s-sejħiet li jmiss f’dan is-settur
Irċievi email kull ġimgħa b’avviżi ġodda li jaqblu mal-kriterji tiegħek. Iċċekkja jew aġġusta l-kriterji qabel tattiva t-twissija bla ħlas.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 467953-2026. Iċċekkjat fil-23 Aww 2026 13:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.