Terminas artėja SIMAP · Šaltinis · Kalba: English

This republication is not an official publication. The data published on www.simap.ch are authoritative.

Kosovas · Statybos darbai

Oficialus pavadinimas · English

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Supply and Installation of Pump Systems

Kosovo Energy Efficiency Fund · Kosovas

Peržiūrėti skelbimus šiuo pavadinimu
Oficiali santrauka · English

The Subject of the Contract is the rehabilitation and replacement of pumping equipment in existing pumping stations operated by the participating Regional Water Companies.The Works include, but are not limited to:— verification of hydraulic, mechanical, electrical and civil site conditions— detailed engineering and preparation of implementation documents— supply of pumps, motors, hydraulic equipment, valves, instrumentation, electrical and control…

Kas perkama?
Terminas 2026-10-23 10:00 UTC+02:00
Numatoma vertėNepaskelbta
Paskelbta2026-09-21
Žiūrėti skelbimą Analizuoti šį skelbimą su DI Santrauka, reikalavimai ir terminai pagal šio skelbimo informaciją. Pirkimo dokumentai nėra skaitomi.
Atverti pirkimo dokumentus ↗
simap.ch

Pirkėjo platformoje gali reikėti registruotis. Pasiūlymą pateikite toje platformoje.

Oficiali santrauka · English

Kas perkama?

The Subject of the Contract is the rehabilitation and replacement of pumping equipment in existing pumping stations operated by the participating Regional Water Companies.The Works include, but are not limited to:— verification of hydraulic, mechanical, electrical and civil site conditions— detailed engineering and preparation of implementation documents— supply of pumps, motors, hydraulic equipment, valves, instrumentation, electrical and control systems— dismantling and disposal of existing equipment as required— installation and integration into the existing infrastructure— testing, commissioning, trial operation and handover of the installationsThe Works comprise the rehabilitation and replacement of pumping equipment at the following pumping stations:— RWC Prishtina – Pumping Station…

Pasirengimo sąrašas

Parengti mano pasiūlymą

Oficialiuose dokumentuose tikrintini punktai. Šis vadovas nėra automatinė dokumentų analizė.

  1. Perskaityti visus dokumentus ir pakeitimus
  2. Patikrinti dalyvavimo sąlygas ir reikalaujamus dokumentus
  3. Patikrinti ar reikia apsilankymo arba susitikimo
  4. Peržiūrėti vertinimo kriterijus ir jų svorius
  5. Patikrinti išteklius, biudžetą ir tvarkaraštį
  6. Patvirtinti pateikimo tvarką ir terminą

SIMAP · 2e8be5a3-12bc-4e5e-a20c-13a153a75251. Patikrinta 2026-10-19 04:11.
https://www.simap.ch/en/project-detail/2e8be5a3-12bc-4e5e-a20c-13a153a75251

Prisijunkite →
Analizuokite pirkimo dokumentus PDF formatu

Skelbimų ir PDF analizės naudoja tą patį limitą.

Skelbimo istorija

Pirkimo procedūros laiko juosta

Sekite pagrindinius šios pirkimo procedūros etapus ir atnaujinimus.

Kol kas nenustatyta jokių kitų susijusių skelbimų.

  1. Skelbimas apie pirkimą Peržiūrimas skelbimas

    · SIMAP 2e8be5a3-12bc-4e5e-a20c-13a153a75251

    Atidaryti oficialų skelbimą ↗

Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.

Šaltinis ir patikimumas

SIMAP · 2e8be5a3-12bc-4e5e-a20c-13a153a75251. Patikrinta 2026-10-19 04:11.

Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.

Pranešti apie klaidą el. paštu