Sintesi ufficiale · English
Che cosa viene acquistato?
The Broads Authority is seeking a suitably qualified and experienced contractor to carry out the replacement and installation of electric charging pedestals at 21 locations across the Broads. The works will involve replacing 52 existing Rolec electric charging pedestals with new Meter MACS pedestals, including the removal of existing equipment, installation of concrete plinths and mounting brackets, electrical testing, commissioning and associated ground reinstatement works. It is expected that works should commence on 4 December 2026 and be completed by 26 February 2027.
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The Broads Authority is seeking a suitably qualified and experienced contractor to carry out the replacement and installation of electric charging pedestals at 21 locations across the Broads. The works will involve replacing 52 existing Rolec electric charging pedestals with new Meter MACS pedestals, including the removal of existing equipment, installation of concrete plinths and mounting brackets, electrical testing, commissioning and associated ground reinstatement works. It is expected that works should commence on 4 December 2026 and be completed by 26 February 2027.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
Find a Tender · ocds-h6vhtk-0793fa. Verificato il 2 nov 2026, 08:14.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.