Sintesi ufficiale · English
Che cosa viene acquistato?
• To obtain an automated laser profile measurement tool, which is, battery powered, controlled remotely and self-propelled. • Capable of recording profile of all rails at intervals of, no greater than, 2mm. • Must be capable of carrying out Points and Crossing inspections autonomously. • The proposed measuring device should have capabilities in a number of different areas and be able to combine numerous measurement points within their inspection, such as o Longitudinal Level o Alignment o Cross Level o Five-Point Derailment and have the ability factor in chair gaps/hogging (equivalent to NR/L2/TRK/053 and NR/L2/TRK/1054 Network Rail Standard) o Short Twist and Twist over 3m o Track Gauge o Free Wheel Passage, o Free Wheel Clearances o Measure Switch Residual Opening o Detect Broke or loss
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
• To obtain an automated laser profile measurement tool, which is, battery powered, controlled remotely and self-propelled. • Capable of recording profile of all rails at intervals of, no greater than, 2mm. • Must be capable of carrying out Points and Crossing inspections autonomously. • The proposed measuring device should have capabilities in a number of different areas and be able to combine numerous measurement points within their inspection, such as o Longitudinal Level o Alignment o Cross Level o Five-Point Derailment and have the ability factor in chair gaps/hogging (equivalent to NR/L2/TRK/053 and NR/L2/TRK/1054 Network Rail Standard) o Short Twist and Twist over 3m o Track Gauge o Free Wheel Passage, o Free Wheel Clearances o Measure Switch Residual Opening o Detect Broke or loss
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 641605-2026. Verificato il 17 set 2026, 11:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.