Design, supply, installation, commissioning, operation and maintenance of an Electrical Vehicle (EV) charging hub for 6no. perpendicular vehicular charging spaces (2no. DC and 4no. AC) within the existing Suirside public carpark in Clonmel town centre to the required design standards which will include: Destination EV charger – 1 no. 200KW Direct Current (DC) Dual Charging Unit to be designed under ZEVI Universal Design Guidelines. Neighbourhood EV Chargers - 2 no. 22KW Alternating Current (AC) Dual Charging Units located within EV Enabled Parking Spaces. A power ducting supply (approx. 120m) from the new EV Charging Station to the nearest ESB substation (as per ESB networks specifications) All associated civil and electrical works, surfacing reinstatement as per the RMO purple book requir
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Design, supply, installation, commissioning, operation and maintenance of an Electrical Vehicle (EV) charging hub for 6no. perpendicular vehicular charging spaces (2no. DC and 4no. AC) within the existing Suirside public carpark in Clonmel town centre to the required design standards which will include: Destination EV charger – 1 no. 200KW Direct Current (DC) Dual Charging Unit to be designed under ZEVI Universal Design Guidelines. Neighbourhood EV Chargers - 2 no. 22KW Alternating Current (AC) Dual Charging Units located within EV Enabled Parking Spaces. A power ducting supply (approx. 120m) from the new EV Charging Station to the nearest ESB substation (as per ESB networks specifications) All associated civil and electrical works, surfacing reinstatement as per the RMO purple book requir
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 571350-2026. Verificato il 24 ago 2026, 19:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.