The project provides for the construction works of a split-level two-storey special school building containing 25 classrooms, a hydrotherapy pool, associated clinician and educational support rooms and ancillary spaces with total floor area of c. 6200 sqm. The electrical reserved specialist shall be responsible for the complete electrical services installations associate with the project including appointing sub-specialists for the following installations – Fire Alarms, Voice Evacuation, Structured Cabling, Lightning Protection, Lighting Controls, LV Switchgear, Small Power, Induction Loops, Staff Assist + Attack Installation, Security Installations, Public Address, Emergency Lighting Systems + Solar PV panels, EV charging, Site Services, Site lighting
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The project provides for the construction works of a split-level two-storey special school building containing 25 classrooms, a hydrotherapy pool, associated clinician and educational support rooms and ancillary spaces with total floor area of c. 6200 sqm. The electrical reserved specialist shall be responsible for the complete electrical services installations associate with the project including appointing sub-specialists for the following installations – Fire Alarms, Voice Evacuation, Structured Cabling, Lightning Protection, Lighting Controls, LV Switchgear, Small Power, Induction Loops, Staff Assist + Attack Installation, Security Installations, Public Address, Emergency Lighting Systems + Solar PV panels, EV charging, Site Services, Site lighting
Gratuito
Ricevi le prossime gare di questo settore
Ricevi ogni settimana un’e-mail con i nuovi avvisi che corrispondono ai tuoi criteri. Verifica o modifica i criteri prima di attivare l’avviso gratuito.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 351026-2026. Verificato il 22 ago 2026, 11:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.