Sintesi ufficiale · English
Che cosa viene acquistato?
Background and purpose The procurement mainly comprises a system for control and follow-up of the street light installations, including the accompanying communication services and the necessary equipment. The existing units for controlling street lights currently communicate via Telenor ́s 2G network. As a result of the planned phasing-out of 2G, there is a need to replace parts of the current equipment. There are also units that use 4G/5G, and these can be relevant for further use. The aim of the procurement is to facilitate energy efficient operation of the street light installations, at the same time that the system shall be reliable and provide a good overview of the status and function. The contract period is 3 years from when the contract is signed, the contract will be extended ther
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Background and purpose The procurement mainly comprises a system for control and follow-up of the street light installations, including the accompanying communication services and the necessary equipment. The existing units for controlling street lights currently communicate via Telenor ́s 2G network. As a result of the planned phasing-out of 2G, there is a need to replace parts of the current equipment. There are also units that use 4G/5G, and these can be relevant for further use. The aim of the procurement is to facilitate energy efficient operation of the street light installations, at the same time that the system shall be reliable and provide a good overview of the status and function. The contract period is 3 years from when the contract is signed, the contract will be extended ther
Gratuito
Ricevi le prossime gare di questo settore
Ricevi ogni settimana un’e-mail con i nuovi avvisi che corrispondono ai tuoi criteri. Verifica o modifica i criteri prima di attivare l’avviso gratuito.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 309730-2026. Verificato il 22 ago 2026, 03:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.