Sintesi ufficiale · English
Che cosa viene acquistato?
The Purchaser intends to enter into a framework agreement, with a maximum of three Contractor(s), for a Services frame agreement for its grid service and maintenance based in Iceland. The scope shall include works in all of the Purchaser utilities e.g. Electricity (400V up to 33kV grid), Hot Water, Cold Water, and Sewage. The scope shall include in whole or in part: • Maintenance of existing grid infrastructure • Fault Repair of existing grid infrastructure • Renewal of existing grid infrastructure • Installation of new utility systems • New Building Connections to existing grid and grid changes necessary to secure new building connections • New installation and maintenance of sub-stations • New installation and maintenance of street cabinets • End to End Responsibilities shall include, bu
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The Purchaser intends to enter into a framework agreement, with a maximum of three Contractor(s), for a Services frame agreement for its grid service and maintenance based in Iceland. The scope shall include works in all of the Purchaser utilities e.g. Electricity (400V up to 33kV grid), Hot Water, Cold Water, and Sewage. The scope shall include in whole or in part: • Maintenance of existing grid infrastructure • Fault Repair of existing grid infrastructure • Renewal of existing grid infrastructure • Installation of new utility systems • New Building Connections to existing grid and grid changes necessary to secure new building connections • New installation and maintenance of sub-stations • New installation and maintenance of street cabinets • End to End Responsibilities shall include, bu
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 272480-2026. Verificato il 21 ago 2026, 22:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.