Službeni sažetak · English
Što se nabavlja?
The Contracting Authority wants to purchase delivery of approximately 490 km 400 kV single core cable XLPE-insulated land cable and 15 km 132 kV single core XLPE-insulated land cable, joints and terminations and installation of joints and terminations. The deliverables are divided into three lots: Lot 1 – NEA, Lot 2 - NEA and Lot 3 – SLF02. The scope of the three tendered lots are described in detail in the enclosed tender documents. For further detail regarding the purchase, reference is made to the tender documents. However please note the following: The Contracting Authority will also accept solutions with a welded aluminum sheath. In case a welded aluminum sheath is offered, the sheath is allowed to carry the full fault current without the support of a wire screen. For further informat
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The Contracting Authority wants to purchase delivery of approximately 490 km 400 kV single core cable XLPE-insulated land cable and 15 km 132 kV single core XLPE-insulated land cable, joints and terminations and installation of joints and terminations. The deliverables are divided into three lots: Lot 1 – NEA, Lot 2 - NEA and Lot 3 – SLF02. The scope of the three tendered lots are described in detail in the enclosed tender documents. For further detail regarding the purchase, reference is made to the tender documents. However please note the following: The Contracting Authority will also accept solutions with a welded aluminum sheath. In case a welded aluminum sheath is offered, the sheath is allowed to carry the full fault current without the support of a wire screen. For further informat
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 577231-2026. Provjereno 24. kol 2026. 21:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.