Otvoreno Izvor · Jezik: English

Srbija · Arhitektonske, inženjerske i inspekcijske usluge

Prijevod u tijeku…

Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project

Serbian Railway Infrastructure JSC · Srbija

Rok 24. ruj 2026. 10:00 UTC
Procijenjena vrijednostNije objavljeno
Objavljeno28. srp 2026.
Otvori službenu obavijest ↗

Službeni sažetak · English

Što se nabavlja?

The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract fo

Izvor i pouzdanost

Izvor: službena TED obavijest 519990-2026, zadnji put provjerena 21. kol 2026. 19:06. Izvorna objava ostaje mjerodavna.

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.