Službeni sažetak · English
Što se nabavlja?
This procurement, E1 Electro, is one of several contracts in a larger project that MOVAR has for Nye Fuglevik Treatment Facility. This contract is for the delivery of electrical installations at the plant and is an execution contract based on NS8405. The contract includes the following activities: • The existing installations shall be disassembled and removed. • Installations are with main distribution boards and boards/distributions for building installations and process. • Constructional installations are conducive paths, earthing, lightning conductor installations, lights, electrical outlets, fire alarm systems, cabling for access control, burglar alarms and communication.…
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
This procurement, E1 Electro, is one of several contracts in a larger project that MOVAR has for Nye Fuglevik Treatment Facility. This contract is for the delivery of electrical installations at the plant and is an execution contract based on NS8405. The contract includes the following activities: • The existing installations shall be disassembled and removed. • Installations are with main distribution boards and boards/distributions for building installations and process. • Constructional installations are conducive paths, earthing, lightning conductor installations, lights, electrical outlets, fire alarm systems, cabling for access control, burglar alarms and communication.…
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 275848-2026. Provjereno 21. kol 2026. 22:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.