Achoimre oifigiúil · English
Cad atá á sholáthar?
Wigan Council are looking to identify a long-term partner to provide Electric Vehicle Charging Infrastructure (EVCI) in Council-owned car parks within the borough. The contract will cover supply, installation, operation, maintenance and customer service functions to provide an end-to-end / turnkey service. The project aims to increase the number, range and accessibility of public charging points across the borough. The contract would operate as a concession contract for a 13 year period with option to extend for 2 years. A mix of devices would be sought to meet the varying needs of residents, businesses and visitors
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
Wigan Council are looking to identify a long-term partner to provide Electric Vehicle Charging Infrastructure (EVCI) in Council-owned car parks within the borough. The contract will cover supply, installation, operation, maintenance and customer service functions to provide an end-to-end / turnkey service. The project aims to increase the number, range and accessibility of public charging points across the borough. The contract would operate as a concession contract for a 13 year period with option to extend for 2 years. A mix of devices would be sought to meet the varying needs of residents, businesses and visitors
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
Find a Tender · ocds-h6vhtk-065309. Seiceáilte ar 5 DFómh 2026 00:12.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.