Achoimre oifigiúil · English
Cad atá á sholáthar?
Dundalk Institute of Technology are seeking to engage Project Management Services with regards to capital works. There are two separate projects,, Refurbishment Capital Project 1: External Fabric and STEM Extension to North and South Building. This project currently is in progress and has design team in place with a number of outstanding contracts to be placed and undertake. Refurbishment Capital Project 2: Provision of Centre for Apprenticeship Craft Provision. This project is yet to commence with no Design team engaged.
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
Dundalk Institute of Technology are seeking to engage Project Management Services with regards to capital works. There are two separate projects,, Refurbishment Capital Project 1: External Fabric and STEM Extension to North and South Building. This project currently is in progress and has design team in place with a number of outstanding contracts to be placed and undertake. Refurbishment Capital Project 2: Provision of Centre for Apprenticeship Craft Provision. This project is yet to commence with no Design team engaged.
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 612297-2026. Seiceáilte ar 7 MFómh 2026 09:06.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.