Achoimre oifigiúil · English
Cad atá á sholáthar?
New build, four-storey with roof plant level, gross internal area approximately 10,517 sqm. The development comprises a HSE Primary Care Centre and GP block with a Tusla child and family agency office in the north-east block, served by two internal landscaped courtyards. The main public entrance is located on the south elevation off a new access road, with a secondary 7-day access entrance on the west elevation off Cardiffsbridge Road. The building is constructed over five levels with finished floor levels rising from 61.000m at Level 00 to 76.800m at Level 04, with roof plant set back 3.5m from the facade and screened at Level 04. External works include a connection to the new access road, 88 car parking spaces, 64 sheltered cycle spaces, hard and soft landscaping and all associated site
Foinse agus iontaofacht
Foinse: fógra oifigiúil TED 571057-2026, seiceáilte go deireanach an 21 Lún 2026 21:06. Is í an bhunfhoilseachán an fhoinse údarásach.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.