Achoimre oifigiúil · English
Cad atá á sholáthar?
This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposed
Foinse agus iontaofacht
Foinse: fógra oifigiúil TED 563004-2026, seiceáilte go deireanach an 21 Lún 2026 21:05. Is í an bhunfhoilseachán an fhoinse údarásach.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.