Achoimre ar an deis
Cad atá á sholáthar?
The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road. The works will involve carrying out a number of boreholes (rotary open-hole drilling and core holes), slit trenches, trial pits, pavement cores, dynamic cone penetrometer. The boreholes are provide
Foinse agus iontaofacht
Foinse: fógra oifigiúil TED 557164-2026, seiceáilte go deireanach an 21 Lún 2026 20:08. Is í an bhunfhoilseachán an fhoinse údarásach.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.