Achoimre ar an deis
Cad atá á sholáthar?
A new two storey extension linked to the existing primary school, demolition required consisting of a new two Classbase Special Educational Needs facility with ancillary accommodation on ground floor and additional teaching rooms to first floor. Associated ancillary siteworks to include revised carparking layout, the demolition of existing bike shelter, external and bin store with new external and bin store and bike shelters to be located near main entrance gate, with provision for additional bicycle spaces to be included and any accompanying landscaping works.
Foinse agus iontaofacht
Foinse: fógra oifigiúil TED 536095-2026, seiceáilte go deireanach an 21 Lún 2026 20:05. Is í an bhunfhoilseachán an fhoinse údarásach.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.