Achoimre ar an deis
Cad atá á sholáthar?
Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this, Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years. The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization: 1. Mutual option for EemsEnergyTerminal when FID is taken - 10 MW from 1-1-2029/30 till 2036 with the possibility to be extended till the end of the contract term. 2. Mutual option to facilitate minor portfolio increases: maximum of 10 MW to be mutually agreed upon during the contract term with a duration of at least one year The electricity shall be physcially delivered to Gasunie including the associated and traceable GoO's. For mor
Foinse agus iontaofacht
Foinse: fógra oifigiúil TED 515341-2026, seiceáilte go deireanach an 21 Lún 2026 19:05. Is í an bhunfhoilseachán an fhoinse údarásach.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.