Achoimre oifigiúil · English
Cad atá á sholáthar?
18 stationers rolling compressors with the accompanying annual fixed service agreement. Beyond this, there is total responsibility for; transport, unloading, storage, assembly, commissioning, function testing, safety testing, take-over protocol and user training. The necessary electrical installations on Espehaugen 17 are not included in the delivery assignment, but it is a prerequisite that the tenderer, together with the Contracting Authority, takes coordination responsibility for the execution of the delivery.
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
18 stationers rolling compressors with the accompanying annual fixed service agreement. Beyond this, there is total responsibility for; transport, unloading, storage, assembly, commissioning, function testing, safety testing, take-over protocol and user training. The necessary electrical installations on Espehaugen 17 are not included in the delivery assignment, but it is a prerequisite that the tenderer, together with the Contracting Authority, takes coordination responsibility for the execution of the delivery.
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 511967-2026. Seiceáilte ar 23 Lún 2026 22:05.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.