Achoimre oifigiúil · English
Cad atá á sholáthar?
The framework agreement shall ensure the contracting authority the necessary competence and capacity within project management, technical project management, HSE (coordinator engineering design and execution), builder ombudsman, technical builder ombudsman, construction management and technical construction management. The contract includes follow-up of projects connected to the contracting authority ́s properties, including alterations, renovations, extensions, extensions and any new buildings.
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
The framework agreement shall ensure the contracting authority the necessary competence and capacity within project management, technical project management, HSE (coordinator engineering design and execution), builder ombudsman, technical builder ombudsman, construction management and technical construction management. The contract includes follow-up of projects connected to the contracting authority ́s properties, including alterations, renovations, extensions, extensions and any new buildings.
Saor in aisce
Faigh na chéad tairiscintí eile san earnáil seo
Faigh ríomhphost seachtainiúil le fógraí nua a oireann do do chritéir. Seiceáil nó athraigh na critéir sula ngníomhachtaíonn tú an foláireamh saor in aisce.
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 427569-2026. Seiceáilte ar 23 Lún 2026 05:05.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.