Achoimre oifigiúil · English
Cad atá á sholáthar?
The Builder needs to join up with a turnkey contractor for a partnering contract for project preparation, engineering design services for and the establishment of a channel, basin, squares, left turn lane in Kanalveien, cycle path and pavement, outside the old Tine Dairies. The project refers to the work as a whole as Mindetorget.The competition will be carried out in two stages: Stage 1 - Prequalification of suppliers Stage 2 - Restricted competition where invited tenderers can submit a tender.
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
The Builder needs to join up with a turnkey contractor for a partnering contract for project preparation, engineering design services for and the establishment of a channel, basin, squares, left turn lane in Kanalveien, cycle path and pavement, outside the old Tine Dairies. The project refers to the work as a whole as Mindetorget.The competition will be carried out in two stages: Stage 1 - Prequalification of suppliers Stage 2 - Restricted competition where invited tenderers can submit a tender.
Saor in aisce
Faigh na chéad tairiscintí eile san earnáil seo
Faigh ríomhphost seachtainiúil le fógraí nua a oireann do do chritéir. Seiceáil nó athraigh na critéir sula ngníomhachtaíonn tú an foláireamh saor in aisce.
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 357883-2026. Seiceáilte ar 22 Lún 2026 13:05.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.