Résumé officiel · English
Quel est l’objet du marché ?
The subject of this tender is the Design, Build, Test and Commissioning an upgrade of the Gozo wastewater treatment plant using environmentally friendly measures and FIDIC Conditions. The scope of this project is to provide process and hydraulic resilience to this plant and ensure effective and efficient treatment of all raw wastewaters generated for a period covering at least up to the year 2040. The Gozo wastewater plant shall be upgraded to treat an average capacity of 14,000 cubic metres per day. The offer/s shall also include the design, installation, testing and commissioning of a new water reclamation plant for the production of an additional 4,000 cubic metres of ‘New Water’. The project shall be implemented in two (2) phases as described in detail in Section 3 – Employer Requireme
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The subject of this tender is the Design, Build, Test and Commissioning an upgrade of the Gozo wastewater treatment plant using environmentally friendly measures and FIDIC Conditions. The scope of this project is to provide process and hydraulic resilience to this plant and ensure effective and efficient treatment of all raw wastewaters generated for a period covering at least up to the year 2040. The Gozo wastewater plant shall be upgraded to treat an average capacity of 14,000 cubic metres per day. The offer/s shall also include the design, installation, testing and commissioning of a new water reclamation plant for the production of an additional 4,000 cubic metres of ‘New Water’. The project shall be implemented in two (2) phases as described in detail in Section 3 – Employer Requireme
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 623303-2026. Vérifié le 11 sept. 2026 à 08:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.