Résumé officiel · English
Quel est l’objet du marché ?
This Qualification System refers to the system that is in place to enable interested parties to submit a response and subsequently qualify for award of Contract for provision of DS3 System Services. Gate 13 covers all 12 services outlined in the Qualification System Briefing Document. The services are split into a number of Lots for the TSO. Lots 1IE – 12IE relate to the System Services required by EirGrid. It is intended that the start date of each of the Contracts awarded under Gate 13 is 1st October 2025.…
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
This Qualification System refers to the system that is in place to enable interested parties to submit a response and subsequently qualify for award of Contract for provision of DS3 System Services. Gate 13 covers all 12 services outlined in the Qualification System Briefing Document. The services are split into a number of Lots for the TSO. Lots 1IE – 12IE relate to the System Services required by EirGrid. It is intended that the start date of each of the Contracts awarded under Gate 13 is 1st October 2025.…
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 604965-2026. Vérifié le 4 sept. 2026 à 11:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.