Résumé officiel · English
Quel est l’objet du marché ?
The scope of the envisaged framework contract includes studies, assembly, testing, commissioning, maintenance, spare parts, operational support, and troubleshooting. The services are requested to prepare and operate the SRF Linac within the Linear IFMIF Prototype Accelerator (LIPAc), part of the IFMIF/EVEDA project. The scope covers the SRF Linac and its subsystems (cryoplant, RF system, diagnostics, control, vacuum, cooling, electrical, and compressed air systems). It also covers the diagnostics provided by CEA for other subsystems of LIPAc and beam dynamic simulation in support of the cryomodule commissioning. Dedicated specific contracts will be used to support the different steps leading to the SRF Linac operations (e.g. completion of SRF Linac integration, warm conditioning of the cou
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The scope of the envisaged framework contract includes studies, assembly, testing, commissioning, maintenance, spare parts, operational support, and troubleshooting. The services are requested to prepare and operate the SRF Linac within the Linear IFMIF Prototype Accelerator (LIPAc), part of the IFMIF/EVEDA project. The scope covers the SRF Linac and its subsystems (cryoplant, RF system, diagnostics, control, vacuum, cooling, electrical, and compressed air systems). It also covers the diagnostics provided by CEA for other subsystems of LIPAc and beam dynamic simulation in support of the cryomodule commissioning. Dedicated specific contracts will be used to support the different steps leading to the SRF Linac operations (e.g. completion of SRF Linac integration, warm conditioning of the cou
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 565434-2026. Vérifié le 24 août 2026 à 18:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.