The Assignment consists of the supply of one (1) 33/110kV 110 MVA power transformer for the Lageland HV-station as per the requirements and shall include: - Engineering and manufacturing; - Factory Acceptance Test (FAT); - Transport to location Lageland HV-station; - Unloading; - Installation; - Site Acceptance Test (SAT); - Supplier documentation (instructions/manuals, etc.); - Warranty. The general purpose of this Tendering Procedure is to conclude an Agreement with a company for the supply of one (1) 33/110kV 110 MVA power transformer. The Agreement shall include an option for the supply of a second (2nd) power transformer with identical specifications.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · Nederlands
The Assignment consists of the supply of one (1) 33/110kV 110 MVA power transformer for the Lageland HV-station as per the requirements and shall include: - Engineering and manufacturing; - Factory Acceptance Test (FAT); - Transport to location Lageland HV-station; - Unloading; - Installation; - Site Acceptance Test (SAT); - Supplier documentation (instructions/manuals, etc.); - Warranty. The general purpose of this Tendering Procedure is to conclude an Agreement with a company for the supply of one (1) 33/110kV 110 MVA power transformer. The Agreement shall include an option for the supply of a second (2nd) power transformer with identical specifications.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 481601-2026. Vérifié le 23 août 2026 à 16:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.