Résumé officiel · English
Quel est l’objet du marché ?
HVC is a Dutch company in the fields of waste processing and the production and distribution of renewable energy. In the early 2020s HVC started with the first HVC geothermal project. This resulted in a HVC Geothermal Development Program , that now include at minimum 15 geothermal projects. Up to now 3 geothermal projects are in progress of completed. The next 2 projects are geothermal project Wippolderlaan (municipality of Westland) and geothermal project Alton (municipality of Heerhugowaard). The start of the realization of both projects is scheduled in Q3 2027. For these 2 projects HVC has a demand for freshwater pumps. The delivery date for the needed freshwater pumps for the Wippolderlaan project is September 1st, 2027. The delivery date for the needed freshwater pumps for the Alton p
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
HVC is a Dutch company in the fields of waste processing and the production and distribution of renewable energy. In the early 2020s HVC started with the first HVC geothermal project. This resulted in a HVC Geothermal Development Program , that now include at minimum 15 geothermal projects. Up to now 3 geothermal projects are in progress of completed. The next 2 projects are geothermal project Wippolderlaan (municipality of Westland) and geothermal project Alton (municipality of Heerhugowaard). The start of the realization of both projects is scheduled in Q3 2027. For these 2 projects HVC has a demand for freshwater pumps. The delivery date for the needed freshwater pumps for the Wippolderlaan project is September 1st, 2027. The delivery date for the needed freshwater pumps for the Alton p
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 469633-2026. Vérifié le 23 août 2026 à 14:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.