Résumé officiel · English
Quel est l’objet du marché ?
This procurement is to establish a Shortlist of competent Contractors for the design, supply, installation, commissioning, certification, operation and maintenance of public EV charging units for Cork County Council and Kerry County Councils' Pilot Electric Vehicle Charging Point Scheme. These Charging Points which will be installed in public accessible locations (5no. locations are currently proposed). It is the Contracting Authorities intention to enter into a Shortlist Agreement with Shortlist Members in a Multi-Party Shortlist for Design, Supply, Installation, Commissioning, Certification and Subsequent Operation and Maintenance of Electric Vehicle Chargers and associated infrastructure under the Department of Transport’s Regional and Local EV Charging Network Plan. This plan is being
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
This procurement is to establish a Shortlist of competent Contractors for the design, supply, installation, commissioning, certification, operation and maintenance of public EV charging units for Cork County Council and Kerry County Councils' Pilot Electric Vehicle Charging Point Scheme. These Charging Points which will be installed in public accessible locations (5no. locations are currently proposed). It is the Contracting Authorities intention to enter into a Shortlist Agreement with Shortlist Members in a Multi-Party Shortlist for Design, Supply, Installation, Commissioning, Certification and Subsequent Operation and Maintenance of Electric Vehicle Chargers and associated infrastructure under the Department of Transport’s Regional and Local EV Charging Network Plan. This plan is being
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 450839-2026. Vérifié le 23 août 2026 à 10:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.