Résumé officiel · English
Quel est l’objet du marché ?
The Owner intends to install two (2) Onshore Power Supply (OPS) systems, each rated at 12 MVA. Power supply from grid supply at 33 kV, output from OPS shall be 11/6.6 kV and capable of operating at 50/60 Hz. The installation will comprise two connection zones, and each zone will have three (3) connection points serving a single cruise ship. The Owner is seeking modular solution-based on up to a maximum container size of 30-foot modules stackable to a maximum height of three. The design shall consider all applicable load conditions and seismic forces that the structure may be subjected to, according to specification in this document and other applicable specifications. The OPS containers assembly will be enclosed with a structure which will be built by Other. This tender is for the OPS powe
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The Owner intends to install two (2) Onshore Power Supply (OPS) systems, each rated at 12 MVA. Power supply from grid supply at 33 kV, output from OPS shall be 11/6.6 kV and capable of operating at 50/60 Hz. The installation will comprise two connection zones, and each zone will have three (3) connection points serving a single cruise ship. The Owner is seeking modular solution-based on up to a maximum container size of 30-foot modules stackable to a maximum height of three. The design shall consider all applicable load conditions and seismic forces that the structure may be subjected to, according to specification in this document and other applicable specifications. The OPS containers assembly will be enclosed with a structure which will be built by Other. This tender is for the OPS powe
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 402896-2026. Vérifié le 22 août 2026 à 22:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.