Résumé officiel · English
Quel est l’objet du marché ?
The aim of the procurement is to establish a framework agreement for engineering design services (preliminary engineering design services, detailed engineering design services, general consultancy and development of technical plans) within roads, water and sewage (HVAC). Other services that naturally come under the disciplines included in the framework agreement can be provided if there is a need in the contract period. The engineering design services will, for example, be connected to road installations, water and sewage in connection with construction work or replacement of a pump station.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The aim of the procurement is to establish a framework agreement for engineering design services (preliminary engineering design services, detailed engineering design services, general consultancy and development of technical plans) within roads, water and sewage (HVAC). Other services that naturally come under the disciplines included in the framework agreement can be provided if there is a need in the contract period. The engineering design services will, for example, be connected to road installations, water and sewage in connection with construction work or replacement of a pump station.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 392016-2026. Vérifié le 22 août 2026 à 20:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.