Résumé officiel · English
Quel est l’objet du marché ?
The procurement is for the complete delivery, installation and commissioning of 1 145 kV SF6-free gas insulated switching system (GIS) with 9 double switch lanes and a double compilation rail. to Øygarden connection station. The procurement is for BKK's bays, including Blomøy and Energiparken, as well as an option for future bays (Energiparken Nord, Energiparken Sør and 2nd "future"). Øygarden connection station is a joint station between BKK AS and Statnett SF. In accordance with the Builder Agreement between the parties (dated 03.05.2023), the BKK shall in addition establish 3 145 m2 transformer fields on behalf of Statnett, which is included as an option for the procurement. The ownership of these fields will be transferred to Statnett upon take over. The contract with the supplier will
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The procurement is for the complete delivery, installation and commissioning of 1 145 kV SF6-free gas insulated switching system (GIS) with 9 double switch lanes and a double compilation rail. to Øygarden connection station. The procurement is for BKK's bays, including Blomøy and Energiparken, as well as an option for future bays (Energiparken Nord, Energiparken Sør and 2nd "future"). Øygarden connection station is a joint station between BKK AS and Statnett SF. In accordance with the Builder Agreement between the parties (dated 03.05.2023), the BKK shall in addition establish 3 145 m2 transformer fields on behalf of Statnett, which is included as an option for the procurement. The ownership of these fields will be transferred to Statnett upon take over. The contract with the supplier will
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 375249-2026. Vérifié le 22 août 2026 à 16:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.