Résumé officiel · Deutsch
Quel est l’objet du marché ?
The Contracting Authority intends to expand and further develop the existing facility in Wiener Neustadt with a new proton synchrotron particle accelerator that is being developed in scope of the MACAP project. The purpose of this expression of interest is to explore the market and obtain non-binding feedback on feasible concepts for a complete proton injector system (from source to medium energy beam transfer line - MEBT).
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · Deutsch
The Contracting Authority intends to expand and further develop the existing facility in Wiener Neustadt with a new proton synchrotron particle accelerator that is being developed in scope of the MACAP project. The purpose of this expression of interest is to explore the market and obtain non-binding feedback on feasible concepts for a complete proton injector system (from source to medium energy beam transfer line - MEBT).
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 324290-2026. Vérifié le 22 août 2026 à 06:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.