Mitä hankitaan?
The development will consist of the phased demolition of the existing school buildings and the removal of existing prefabricated temporary accommodation on the site, the phased construction of a new 1 to 3 storey 1000 pupil post-primary school comprising Teaching spaces, Ancillary Spaces, Physical Education Hall Facility, Special Education Needs Suite, General purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of c 10, 802m2, the reconfiguration of the existing pedestrian and vehicular entrance to the site and all associated site works including bicycle parking, car parking and set down areas, open spaces/ landscaping, boundary treatments, plant, bin stores, site…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
The development will consist of the phased demolition of the existing school buildings and the removal of existing prefabricated temporary accommodation on the site, the phased construction of a new 1 to 3 storey 1000 pupil post-primary school comprising Teaching spaces, Ancillary Spaces, Physical Education Hall Facility, Special Education Needs Suite, General purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of c 10, 802m2, the reconfiguration of the existing pedestrian and vehicular entrance to the site and all associated site works including bicycle parking, car parking and set down areas, open spaces/ landscaping, boundary treatments, plant, bin stores, site…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 690905-2026. Tarkistettu 7.10.2026 klo 11.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.