Virallinen yhteenveto · English
Mitä hankitaan?
Landsvirkjun hereby invites tenders for engineering consultancy services for the re-evaluation of the project planning design for the Holtavirkjun hydropower plant in the lower Þjórsá river in Iceland. The Services include review of an outdated design (draft AACE stage 2), finalisation of required design revisions to issue a preliminary design (AACE stage 3), and preparation of information required to finalise the environmental impact assessment (EIA) for the project.
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
Landsvirkjun hereby invites tenders for engineering consultancy services for the re-evaluation of the project planning design for the Holtavirkjun hydropower plant in the lower Þjórsá river in Iceland. The Services include review of an outdated design (draft AACE stage 2), finalisation of required design revisions to issue a preliminary design (AACE stage 3), and preparation of information required to finalise the environmental impact assessment (EIA) for the project.
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 619239-2026. Tarkistettu 11.9.2026 klo 6.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.